
Paper bottles, jars and tubes made of molded fiber Containers designed for your contents and your filling
One-piece fiber body, for bottles and jars with thread and fiber screw cap — internal barrier developed for your contents and tested on the prototype (WVTR, OTR), declaration of conformity according to Regulation (EC) 1935/2004 for your container.
Designed for your contents, tested in the filling trial on your line — design, tool making and production from a single source.
Why molded fiber
One-piece containers made of virgin fiber with thread in the body
We develop every container together with you from your requirements: conformity for exactly your bottle, jar or tube, barrier for your contents, closure for your filling. The bottle and container have won awards: WorldStar Packaging Award 2025 in two categories, first place at The Sustainability Award 2025 and gold at the Shop! D-A-CH Awards 2025.
Food contact
Food contact compliant
Suitable for direct contact with your food — according to the declaration of conformity under Regulation (EC) 1935/2004, which we prepare for exactly your container.
Barrier
Barrier to your requirements
Internal coating against moisture, water vapor and oxygen (WVTR, OTR): you specify which one you need — tested on the prototype with your contents.
Closure
Thread directly in the body
The PAPACKS Model S10 forms thread and undercut in the body. Screw caps or lids are also made of fiber.
We define coating, volume and closure with you — based on your contents, your filling and your shelf-life target. We design the container to your specifications, test it on the prototype and only then build the production tool. You will find the documents for your supplier approval in the download area.
Examples
Every fill product gets its own shape
Your container is created the same way as these examples — you specify volume, closure and label panel.

Capsules
Bottle with screw cap
Thread in the body, fiber screw cap. Designed for capsules and tablets.

Tablets
Tube for effervescent tablets
The tablets sit in a row and come out one at a time. We set the internal barrier according to the moisture sensitivity of your tablets.

Powder
Jar for powder
Wide opening, threaded lid. The internal coating follows your shelf-life target.

Label
Space for your brand
Smooth all-round label panel in the body. You apply your paper label during filling; on request, we emboss logo and texture directly in the tool.

Presentation
Cigar tube
One tube per cigar, with a band in your colors. The fiber remains visible and tangible as the surface.

Closure
Fiber screw cap
Grip ridges on the rim, thread on the inside — the screw cap is made of fiber, just like the body.
Paper bottles, jars and tubes made of molded fiber are one-piece hollow bodies made of virgin fiber with thread and closure, with a functional internal coating as a barrier. PAPACKS develops them for your contents and forms them on the PAPACKS Model S10, the robotic line for hollow bodies with undercuts. The container is designed for dry fill products such as powders, tablets, capsules, spices and tea; liquid and pasty products follow after barrier development and testing on the prototype. We clarify in a consultation what is possible for your product — volume, barrier and conformity are later stated in the data sheet of your container.
At a glance
Orientation in the first conversation
We develop custom containers together with you. Volume, format, schedule and tools as guide values; the budget quote after the initial call as a guide.

Minimum quantity
100,000 units per year
From this annual volume, we develop your container as a custom shape; series production starts after your approval. The volume counts per container shape.

Container format
The shape follows your product
Bottle, jar or tube, with the volume matched to your contents. We design thread, undercut and label panel into the body.

Timeline
Around 12 weeks from your approval
First prototype: around 4 weeks after the kickoff. From your approval, tool making, pre-series and start of production follow in around 12 weeks. If barrier development is included, your budget quote states the schedule.

Tooling costs
Tools
Tooling costs depend on annual volume and term. We discuss the detailed terms and a five-year warranty on our tools from our in-house tool shop in detail, based on your requirements.
From first conversation to series production
How your container is created
Four steps from the first question to running series production. For the barrier, a development phase is added: we define the requirements with you and test coating, container and contents together — you give the approval for series production.

01
Initial consultation
You tell us contents, volume, closure, filling process, shelf-life target, quantity and date. You receive feasibility, budget quote and schedule as a guide — the binding quote follows after development. Within a few days.

02
Samples and examples
Sample containers from our development on the PAPACKS Model S10 — bottle, jar or tube, matched to your project: you assess material quality, feel and appearance on a real container.

03
Design and prototype
Design and CAD for your contents, coated prototypes for the barrier test and prototypes in quantity for the filling trial on your line — then your approval. Around 4 weeks after the kickoff.

04
Tool and series production
Production tool made in-house, pre-series and initial samples from the production tool, then ongoing series production on the PAPACKS Model S10 — delivered according to your call-off schedule. Around 12 weeks from your approval.
The times are planning estimates; they depend on your approvals, the capacity of our teams and the scope of your project. Your project team at PAPACKS presents the detailed plan around 1–2 weeks after the kickoff. You receive the process and budget quote as a guide after our initial call — with development, tool and unit price; the binding quote follows after development.
Evidence
Certificates and documents for your approval
Certificates with certification body and scope, the declaration of conformity for your container — the documents for your quality assurance in one place.
Food contact
Conformity for each package
For your container, you receive our declaration of conformity according to Regulation (EC) 1935/2004 with scope — type of food, temperature and contact time — for container and closure, tested as delivered with coating. We jointly define additional tests on the finished product — on request via an accredited laboratory.
Declaration of conformity according to Regulation (EC) 1935/2004 — prepared individually for each container, with the initial sampling from the production tool
Substances
Material declaration for each container
We do not add PFAS in the formulation, coating or process. The declaration of conformity for your container documents compliance with the PFAS limits that apply to all food contact packaging (Art. 5(5) Regulation (EU) 2025/40) and the test for optical brighteners (BfR XXXVI).
Declaration of conformity for your container — prepared individually
Disposal
Recyclability for each container
We have the recyclability of your container assessed product-specifically by cyclos-HTP — as delivered, with coating and closure; we commission the report for your item on your request.
Test method: cyclos-HTP according to the ZSVR minimum standard and DIN EN 13430 — assessment per item on request
Production
BRCGS Grade A
Containers from our BRCGS-certified plant are manufactured to the BRCGS Global Standard Packaging Materials, HACCP included. Your quote states which plant manufactures your container; your quality assurance receives the certificate with scope.
BRCGS Packaging Materials, Issue 7, Grade A · TÜV Rheinland Cert GmbH — Download documents
Quality
ISO 9001:2015
Documented processes from inquiry to delivery; every batch traceable back to raw material receipt.
ISO 9001:2015 · TÜV Rheinland Cert GmbH — Download documents
Raw material
FSC® Mix Credit
Virgin wood fiber from responsible sources: FSC® Mix Credit, a volume balance across the supply chain.
License FSC-C125098 · applies to items identified as FSC® Mix Credit on the invoice and delivery note — Download documents
Frequently asked questions
What customers ask before the first sample
Next step
Let's talk about your product
Step 1
Consultation
You tell us contents, volume, closure, filling process and annual volume. You receive feasibility, budget quote and schedule as a guide — the binding quote follows after development.
Consultation →Samples
Request samples
Sample containers from our development on the PAPACKS Model S10 — bottle, jar or tube, matched to your project, so you can assess material quality, feel and appearance.
Request samples →Form
Send inquiry
Describe your project in the form — dimensions, annual volume, ideally with a drawing or sketch as a PDF — no appointment needed. We review your details and get back to you with an initial assessment and the next steps.
Send inquiry →
