
Molded fiber for automated lines and filling systems Designed for your gripper, your denester and your filling — in molded fiber
We design gripping surfaces, draft angles and stacking pitch for your line. You test prototypes on it before the production tool.
Designed to your handling data, tested on the prototype on your line — design, tool and series production from a single source.
Clarify first
Three questions before design
Handling, closing, line trial: your answers determine feasibility, budget price and schedule — for one molded part as a pilot or all molded parts on your line.
Handling
Can it be gripped and denested?
Vacuum, clamp gripper or denester: we design gripping surfaces, draft angles and stacking pitch to your handling data. We develop your shape from 100,000 units per year per molded part.
Closing
Will it run through closing and labeling?
You close bowls with heat-sealable lidding paper, and bottles and jars from the PAPACKS Model S10 with a screw cap. We design the label panel and embossing to your labeling technology.
Line trial
How do you test before the tool?
With prototypes in quantity on your system: you check denesting, gripping, filling and closing at every station and then approve the production tool. Pre-series and initial samples from the production tool also run on your line.
Molded fiber for automated lines means: molded parts and containers made of molded fiber, manufactured from virgin fiber, whose gripping surfaces, draft angles and stacking pitch are designed to the handling data of your system. You close bowls with lidding paper, and bottles and jars from the PAPACKS Model S10 with a screw cap. We supply prototypes for your line trial, build the production tool and manufacture the series. You will find the documents for your supplier approval in the download area.
Getting started
What you provide, what you receive
Your handling data is the starting point. You receive prototypes for your line trial and a molded part designed for your line.
Your information
What you provide
- Handling data for your line: gripper type, cycle rate and stack height in the magazine
- Manufacturer and model of your system
- Your closing, sealing and labeling technology
- Your product or a drawing with outer dimensions and inner contour
- Annual volume and the date by which your molded part should be running on the line
Our deliverables
What you receive
- Feasibility, budget price and schedule as a guide within a few days
- The design of your molded part, engineered for gripper, denester and magazine
- Prototypes for the line trial on your system — we set the quantity in the initial consultation based on your trial
- The data sheet for your molded part with dimensions and tolerances; for food contact, the declaration of conformity for each molded part
- How we share your tooling costs depends on annual volume and term — in Wet Molding, up to full coverage; the terms are set out in your quote (Custom Engineering)
From first conversation to series production
How your molded part gets onto the line
Four steps from the first question to running series production — design starts with your handling data. You give approval at three points: development after the budget quote, the production tool after the line trial, the start of production after the pre-series.

01
Initial consultation
You tell us handling data, system, closing technology, volume and date. You receive feasibility, budget quote and schedule as a guide — the binding quote follows after development. Within a few days.

02
Samples and examples
Sample parts from our development, matched to your project: you assess material quality, feel and appearance on a real molded part.

03
Design and prototype
Design and CAD to your handling data, prototypes in quantity for your line trial — then your approval. Around 4 weeks after the kickoff.

04
Tool and series production
Production tool made in-house, pre-series and initial samples from the production tool, then ongoing series production — stacked on pallets, delivered according to your call-off schedule. Around 12 weeks from your approval.
The times are planning estimates; they depend on your approvals, the capacity of our teams and the scope of your project. Your project team at PAPACKS presents the detailed plan around 1–2 weeks after the kickoff. You receive the process and budget quote as a guide after our initial call — with development, tool and unit price; the binding quote follows after development.
Products for this starting point
Which product suits your line
Trays, bowls, bottles or protective packaging — each product page shows examples, key parameters and evidence. Choose by your product.
Industry
Industrial Packaging & Trays
Workpiece carriers and transport trays, nestable and stackable — with gripping surfaces and stacking pitch for your assembly and inspection line.
View product →Food
Food Service
Bowls, cups and inserts for your food — bowls and cups with a sealing flange for your sealing machine, declaration of conformity for each molded part.
View product →Filling
Paper Bottles & Containers
Bottles, jars and tubes from the PAPACKS Model S10 — bottle and jar with thread and fiber screw cap, the label panel to your label format.
View product →Protection
Protective packaging
End caps, cushioning and inserts in your carton dimensions — designed for your packing station and your shipping route.
View product →Frequently asked questions
What customers ask before the line trial
Next step
Let's talk about your line
Step 1
Consultation
You tell us handling data, system, closing technology, product and annual volume. You receive feasibility, budget quote and schedule as a guide — the binding quote follows after development.
Consultation →Samples
Request samples
Sample parts from our development, matched to your project, so you can assess material quality, feel and appearance. Prototypes in your dimensions for the line trial follow in step 03.
Request samples →Drawing
Request a budget quote
Give us outer dimensions, gripper type, stack height and annual volume, and send your drawing along. Based on your drawing, you receive feasibility, budget price and schedule as a guide within a few days — the binding quote follows after development.
Request a budget quote →





